Noticias » Estado de los Proyectos » Pugang Steel CCM#3 Designed by CISDI Started Operation Successfully
Pugang Steel CCM#3 Designed by CISDI Started Operation Successfully
2010-10-22 04:31:51
Pugang Steel CCM#3 Designed by CISDI Started Operation Successfully

October 20, 2010 witnessed the official startup of CCM #3 in Pugang (Baosteel Group).Slab caster #2 was built in Step 1 of Pugang Steel (Luojing Plant), and slab caster #3 was implemented in Step 2 to support three 150t converters. The total capacity will reach 3.05Mt/a qualified slabs when CCM#3 is completed.

CISDI was contracted to provide plant design and equipment design for the project (except for the caster). The accurate plant design based on 3D technique contributes to much lower steel consumption for the plant building and hence much lower capital cost. The client is quite satisfactory with the project investment, design progress and quality.

Inicio | Sobre nosotros | Noticias | Productos | Investigación y desarrollo | Formación | Medios de comunicación | Contacto
Dirección: No.1 Shuanggang Road, Yuzhong District, Chongqing 400013, China.  Código postal: 400013
Copyright by CISDI Group @ 2010