Noticias » Estado de los Proyectos » Piston in BFG Holder Successfully Float up in Shuicheng Steel
Piston in BFG Holder Successfully Float up in Shuicheng Steel
2010-11-17 04:13:50

The BFG holder supplied by CISDI on EPC basis for Shuicheng Steel (Shougang Group) started piston lifting on the morning of November 11, 2010. The piston was successfully lifted by 2.1m by 31 minutes of continuous blowing, reaching the floating level. The gas holder features constant gas pressure during the floating. The side boards, posts, piston and top of gas holder proved satisfactory. This milestone indicates the start of floating erection following the completion of gas holder steelwork erection.

Inicio | Sobre nosotros | Noticias | Productos | Investigación y desarrollo | Formación | Medios de comunicación | Contacto
Dirección: No.1 Shuanggang Road, Yuzhong District, Chongqing 400013, China.  Código postal: 400013
Copyright by CISDI Group @ 2010