Noticias » Estado de los Proyectos » BF#3 of Anyang Steel Starts Operation
BF#3 of Anyang Steel Starts Operation
2013-05-12 10:00:17
BF#3 of Anyang Steel Starts Operation
BF#3
BF#3 of Anyang Steel Starts Operation
Top-Combustion Hot Stoves
BF#3 of Anyang Steel Starts Operation
BF Tapping
BF#3 of Anyang Steel Starts Operation
PCI Station

BF#3 (4,747m3) of Anyang Steel designed by CISDI was successfully blown-in on March 19, 2013 and smoothly tapped in the morning of 20th, with all system and equipment running properly. The BF is designed to produce 10,918t hot metal daily.

BF#3 is a new blast furnace installed in existing plant area, for which CISDI has developed a satisfactory general layout by making the best out of the limited space in narrow terrace.  

The BF#3 is implemented with CISDI’s top de alto-forno, serial-connected closed soft water circulation system, top-combustion hot stoves with high blast temperature, slag granulation by rotary drum, dense-phase coal injection and dry dedusting technology.  

Inicio | Sobre nosotros | Noticias | Productos | Investigación y desarrollo | Formación | Medios de comunicación | Contacto
Dirección: No.1 Shuanggang Road, Yuzhong District, Chongqing 400013, China.  Código postal: 400013
Copyright by CISDI Group @ 2010